← All case studies

A production-ready design system in one week

6 chapters · about 3 min read

client
Taste Labs
role
Design Systems Lead
timeline
One week (about 55 hours)
50+ accessible components 1 week / ~55 hours

01 / 06 · the brief

A full design system in one week

the problem

Taste Labs needed 50+ components, tokens, icons, theming and accessibility, ready to rebuild in React and Storybook.

what I did

I planned the system around one source of truth: light and dark themes from a single token set, with no manual overrides.

how

Figma variablesClaude
1 week / ~55 hours

Tools

Components built with slots and auto-layoutThe three-tier token layer and light and dark themesAI co-pilot for production volume, so I could focus on decisionsBuilding the motion foundation

In pictures

Want results like this for your team? Let's talk.

Email design@jaydeolivia.com

image 1 of 6